-
K517.92THIS IS A SPECIAL ORDER ITEM THAT REQUIRES A MINIMUM ORDER OF 15 UNITS & PRODUCTION TIME OF 45-90 DAYS.
-
K189.61THE 60104 PUMP SELLS AS THE FEP04SV KIT. TO ORDER THE PUMP ALONE, PLEASE ORDER A MINIMUM ORDER OF 30 UNITS & PRODUCTION TIME OF 45-90 DAYS.
-
K189.61YOU MIGHT CONSIDER THE FACET 60104, WHICH IS SIMILAR WITH A LITTLE LESS PRESSURE AND LIFT. THIS IS A SPECIAL ORDER ITEM THAT REQUIRES A MINIMUM ORDER OF 30 UNITS & PRODUCTION TIME OF 45-90 DAYS.
-
K470.53Normally ships same day.
-
K210.70Normally ships same day.
-
K512.67Normally ships same day.
-
K512.67Normally ships same day.
-
K512.67Normally ships same day.