-
P2,046.20THIS IS A SPECIAL ORDER ITEM THAT REQUIRES A MINIMUM ORDER OF 15 UNITS & PRODUCTION TIME OF 45-90 DAYS.
-
P749.11THE 60104 PUMP SELLS AS THE FEP04SV KIT. TO ORDER THE PUMP ALONE, PLEASE ORDER A MINIMUM ORDER OF 30 UNITS & PRODUCTION TIME OF 45-90 DAYS.
-
P749.11YOU MIGHT CONSIDER THE FACET 60104, WHICH IS SIMILAR WITH A LITTLE LESS PRESSURE AND LIFT. THIS IS A SPECIAL ORDER ITEM THAT REQUIRES A MINIMUM ORDER OF 30 UNITS & PRODUCTION TIME OF 45-90 DAYS.
-
P1,858.96Normally ships same day.
-
P832.43Normally ships same day.
-
P2,025.45Normally ships same day.
-
P2,025.45Normally ships same day.
-
P2,025.45Normally ships same day.