-
L3,644.79THIS IS A SPECIAL ORDER ITEM THAT REQUIRES A MINIMUM ORDER OF 15 UNITS & PRODUCTION TIME OF 45-90 DAYS.
-
L1,334.35THE 60104 PUMP SELLS AS THE FEP04SV KIT. TO ORDER THE PUMP ALONE, PLEASE ORDER A MINIMUM ORDER OF 30 UNITS & PRODUCTION TIME OF 45-90 DAYS.
-
L1,334.35YOU MIGHT CONSIDER THE FACET 60104, WHICH IS SIMILAR WITH A LITTLE LESS PRESSURE AND LIFT. THIS IS A SPECIAL ORDER ITEM THAT REQUIRES A MINIMUM ORDER OF 30 UNITS & PRODUCTION TIME OF 45-90 DAYS.
-
L3,311.27Normally ships same day.
-
L1,482.76Normally ships same day.
-
L3,607.83Normally ships same day.
-
L3,607.83Normally ships same day.
-
L3,607.83Normally ships same day.